EnergySignal

Articles

Notes on energy, compute and the sites where they meet.

H100 rent is up 47% from its December 2025 low. Silicon Data H100 rental price index, US dollars per GPU-hour: $3.06 on 1 Sep 2024, $2.37 at the index launch on 27 May 2025, $2.00 low on 9 Dec 2025, then $2.78, $2.82, $2.88 and $2.93 through October to 1 Nov 2026. Articles · 18

The Price of a GPU-Hour Went Up, Not Down

The H100 rents for $2.93 per GPU-hour on the Silicon Data index, 1 Nov 2026, up 47% from its December low. What a rising price says about demand, and about power.

3 November 2026
Cover: Beyond the Big Hubs, Europe's search for accessible power. A dot map of Europe with the main hubs marked in red and the Nordics, Iberia and Italy in green. Articles · 02

Beyond the Big Hubs

Europe's main data centre markets are short of power. Investment is moving toward it, and the queues are following.

27 October 2026
Cover: Carrying the Energy Bill, how a compute partner can help European industry stay in the game. Bars compare EU and US energy prices: electricity 2 to 3 times higher in the EU, gas 3 to 5 times higher, as reported in the Draghi report of 2024. Articles · 04

Carrying the Energy Bill

A compute partner can turn a site's spare hours, waste heat and flexibility into income that offsets the bill.

23 October 2026
Cover: Curtailment Is a Revenue Problem, what a flexible load next to a wind or solar farm can earn. One summer day at a solar farm: the output curve peaks at midday, and the hours from late morning to mid-afternoon are shaded as hours with a price below zero, where a flexible load runs. Articles · 09

Curtailment Is a Revenue Problem

The hours a farm is paid nothing now decide its return. A flexible load next door wants exactly those hours.

22 October 2026
Cover: First Ready, First Served, why a site that is ready now is worth more. The same twelve connection requests drawn twice: ordered by date of application, with the four ready projects scattered behind eight that are not, and ordered by readiness, with the four ready projects at the front. Articles · 06

First Ready, First Served

Europe's grid queues are being re-ranked by readiness and flexibility. A site with a connection in hand just became more valuable.

20 October 2026
Cover: Power Comes First, what is changing around data centres. A dot map of the United States with New York, Pennsylvania, Ohio and Texas highlighted. Articles · 01

Power Comes First

Moratoriums, ballot measures and new grid rules are changing how US data centres get power.

15 October 2026
Cover: The EU's New Data Centre Label, what it grades, what it states, and what it rewards. The energy efficiency class ladder from A (PUE of 1.15 or below) to G (above 1.9), with the EU average of 1.36 marked at class D. Labels from 15 August 2027, generated by the EU database. Articles · 11

The EU's New Data Centre Label

From August 2027 every large EU data centre gets a label. Heat reuse and flexibility are printed on it.

13 October 2026
Cover: Heat as a Second Income, what compute heat is worth to a site. A bar showing that 1.8% of the heat made by EU data centres in 2024 was reused, with 67 of 770 reporting sites reusing any heat, from the European Commission's report of 21 September 2026. Articles · 07

Heat as a Second Income

Europe reuses 1.8% of its data centre heat. The rules now insist, and a site with a use for warm water has a second income waiting.

8 October 2026
Cover: Why Central Europe, industrial power, district heat and room to grow. A dot map of Europe with Czechia, Poland, Slovakia, Austria and Hungary in green, the main hubs in red, and Prague, Warsaw, Vienna, Ostrava, Poznań and Budapest marked. Articles · 08

Why Central Europe

Not the cheapest grid power, but industrial sites with their own generation, the densest heat networks after the Nordics, and room to grow.

22 September 2026
Cover: Not All Megawatts Are Equal, flexible energy and the firm power GPUs need. A flat gold line for firm power every hour above a variable green line for flexible energy that drops to zero at times. Articles · 03

Not All Megawatts Are Equal

Why flexible compute and GPU clusters need different power, and how to sequence a project today.

8 September 2026
Cover: Pricing Flexibility, what a load that can step back is worth. Four tiles: a faster connection, 9.1 GW of off-peak capacity offered in the Netherlands; lower charges, up to 65% off grid tariffs in the Netherlands; payments, 500 pounds per MWh for a turn-down test in Great Britain; headroom, 76 GW connectable at 0.25% curtailment in a US study. Articles · 10

Pricing Flexibility

A faster connection, lower network charges, payments for stepping back, and headroom: four currencies regulators now pay in.

25 August 2026
Cover: The Connection That Stays, post-coal sites, land, grid capacity and a heat duty to meet. The site in one line: a closing coal station leaves a firm high-voltage connection with switchyard and land, which can carry both layers of compute, flexible first and a firm core after. Articles · 16

The Connection That Stays

When a coal station closes, the connection, the land and the heat duty stay.

18 August 2026
Cover: Landfill Gas Does Not Wait, a buyer for the engine in the hours the grid pays nothing. The site in one line: a landfill with declining gas feeds gas engines sized for the early years, which feed a flexible layer of compute sized to the decline. Articles · 14

Landfill Gas Does Not Wait

The engines and the connection outlast the gas. A flexible load fits that shape.

11 August 2026
Cover: Flare Gas Is Power Without a Grid, associated gas, the routine flaring ban, and compute at the wellsite. The site in one line: a flare of associated gas feeds generator sets at the wellsite, which feed a flexible layer of compute that uses the power on site. Articles · 17

Flare Gas Is Power Without a Grid

Associated gas, the routine flaring ban, and compute at the wellsite.

4 August 2026
Cover: Methane You Drain Is Power You Can Use, coal mine methane, the EU deadline, and compute on the surface. The site in one line: drainage of mine methane feeds gas engines where the methane share allows, which feed a flexible layer of compute on the mine's connection. Articles · 15

Methane You Drain Is Power You Can Use

Coal mine methane, the EU deadline, and compute on the surface.

28 July 2026
Cover: Biogas After the Tariff, why a biogas plant suits compute when the support ends. The site in one line: a digester producing biogas all year feeds a CHP engine for power and heat, which feeds a flexible layer of compute that runs on the engine. Articles · 13

Biogas After the Tariff

The engine still runs all year. What changes is who pays for the power, and when.

21 July 2026
Cover: Anatomy of a Site, an industrial plant with its own power station. A stylised week of station output against plant load, with the exported surplus between them marked in green. Articles · 12

Anatomy of a Site

The shape of one of Europe's best-placed hosts, and where its value sits.

14 July 2026
Cover: What Is Your Site's Energy Worth? A host's guide to the first conversation. One week of a plant's load drawn against its connection limit, with the gap between them marked as spare hours. Articles · 05

What Is Your Site's Energy Worth?

Four things set a site's value to a compute partner, and most of the evidence is already in your files.

7 July 2026