PLANT WITH ITS OWN POWER STATIONS

Stations built for more than the site uses today. The spare part is worth something.

For an industrial site with gas-fired power stations of its own and a heat network inside the fence and beyond it. When the site uses less than the stations were built for, part of the generation, the connection and the land is spare. Two kinds of compute fit a site like this. The starting values are typical of such a site; set them to yours.

TWO KINDS OF COMPUTE, ONE SITE
Flexible compute THE QUICK START
RUNS
In the hours your stations have spare power; steps off when the site needs it.
STARTS
Typically in containers on the connection you have, without a new building or a new grid connection; the site model checks permits and the connection.
GROWS
Step by step, as the spare hours allow.
ASKS
Space, a first term and an investment on your side: [site works, the connection point and the heat tie-in]INDICATIVE · 6 NOV 2026, priced in the site model.
RETURN
Every year: the spare power, where compute's draft range is above what you get today, and the heat you take.
Firm compute, for AI or HPC THE LARGER COMMITMENT
RUNS
All year on a reserved share of your stations and your connection; interruptions typically under 1% of hours, at most 5%, agreed in the contract.
STARTS
Once the site model and the agreements are in place. Fibre nearby, which we check.
GROWS
In blocks of 5 MW and more, on land the site no longer needs or in a hall.
ASKS
Firm power, land or a hall, and an investment on your side: [connection works and land or hall preparation]INDICATIVE · 6 NOV 2026, priced in the site model. 10 years, the operator's commitment to you.
RETURN
Every year: a fee per kW of reserved capacity a month, its power at your tariff plus a margin, and its heat at about 50 °C.
Heat is the flexible module's strength: 55 to 65 °C at the module, about 6,400 MWh per MW a year at 8,000 hours. Income from your connection is the firm block's: a fee per kW of reserved capacity a month, for a term the operator commits to. A natural order is 1, then 2: flexible compute starts on what you have and sizes the firm block. Each can stand alone; nothing on this page commits either side.
Figures in EUR. On the live site this is prefilled from your connection.
€11k to €261k your return a year, before your investment, from flexible compute, low to high case · plus €720k to €2.11M if a firm operator takes 20 MW, indicative
20 MW of flexible compute 74,700 MWh of spare power used 8,390 MWh of heat taken
STEP 1 Generation on site, electrical
The electrical capacity of the stations on site. It caps both blocks below.
1FLEXIBLE COMPUTE, ON YOUR SPARE HOURS
STEP 2 Spare power in low-load hours
20 MW of flexible compute, in containers or in a hall, drawing about 18.7 MW when running. The stations' hourly output against the site's load sets this figure.
STEP 3
4,000 h Weekends and some nights
500 h 8,500 h
Nights and weekends when the stations run for the heat network and the site's load is low, plus the hours the market pays less than the stations' own cost. Weekends alone are about 2,500 hours a year.
STEP 4 The price you sell or offload this power at today
At this price flexible compute adds nothing on the power itself; its case is the heat and the start it gives a firm block.
STEP 5 Also on the site Pick any that apply.
Solar or wind with spare output counts with the surplus above; the site model separates its hours. A battery carries no figure here; the site model counts how it and compute share the hours.
2FIRM COMPUTE, ON YOUR CONNECTION AND LAND
STEP 6 Power that stays firm all year for an AI or HPC block
From the stations and the grid connection together, after the flexible block. These operators care about firmness, a data link and speed to power more than the price: AI campuses are being brought to where the power is, to secondary markets, on average 175 km from cities (JLL, 2026). Blocks from 5 MW; interruptions typically under 1% of hours, at most 5%, agreed in the contract; 10 years, the operator's commitment to you.
Land the site no longer needs
About 3 ha counted, taking about 30 MW of containers with their spacing and transformers. A hall the site no longer uses takes more per hectare.
Term you could offer
The firm term is 10 years, the operator's commitment to you; the top of this range meets it.
HEAT · FROM EITHER KIND
STEP 7
10% about 8,390 MWh a year from flexible, 10,500 to 13,900 MWh from firm
0% 100%
Process heat on hot water, space heating and the heat sent beyond the fence can use it; steam cannot. Set it to what the network actually needs. At 0% all of it goes to dry coolers.
Temperature the network return takes the heat at
Hot-water networks. A temperature lift stage raises the heat taken into this band.
€70/MWh Reference: TTF front month €86/MWh on 15 Oct 2026, as reported by oEnergetice.cz; contracts for 2027 at €72 and for 2028 at €46. Counted at a term price of €70/MWh delivered, a draft figure; set your own above. For a CHP station this is the gas it burns for the heat; if the stations are in the EU emissions trading system, add the allowance cost per MWh of gas.
€60/MWh The temperature lift stage uses electricity, about a sixth to a quarter of the heat it delivers, from a 65 or a 55 °C source. In the spare hours that power is worth what it earns today, so the default follows your answer above. The low case charges it at a quarter; the high case does not.
€11k to €261k your return a year, before your investment, from flexible compute, low to high case · plus €720k to €2.11M if a firm operator takes 20 MW, indicative
20 MW of flexible compute 74,700 MWh of spare power used 8,390 MWh of heat taken
1FLEXIBLE COMPUTE · YOUR RETURN A YEAR, BEFORE YOUR INVESTMENT
Gain on spare power Net heat saving
Low case €11k
High case €261k
PER YEAR LOW HIGH
Gain on spare power, 74,700 MWh €0 €0
Net heat saving, 8,390 MWh €11k €261k
Your return a year €11k €261k
The heat taken replaces 9,330 MWh of the stations' gas a year, €653k at your price; counted at 20 to 40% below the fuel, and the low case also pays the lift stage's electricity at €60/MWh. The other 90% goes to dry coolers.
2FIRM COMPUTE · YOUR RETURN A YEAR, BEFORE YOUR INVESTMENT · INDICATIVE, 6 NOV 2026 €720k to €2.11M
Firm block, all year, load factor 0.60 to 0.80 20 MW
Power through your connection, a year 106,000 to 140,000 MWh
Fee for the reserved capacity, €3 to €7 per kW-month €720k to €1.68M
Its heat at about 50 °C, 10,500 to 13,900 MWh, net €0 to €432k
Its power your tariff plus a margin
The fee is €3 to €7 per kW of reserved capacity a month, take-or-pay and indexed yearly: €36k to €84k per MW of connection a year, or €360k to €840k per hectare at 10 MW a hectare, indicative as of 6 Nov 2026 and counted outside the flexible total. Sites that can take load before 2028 command the top of the range.
START WITH 1, ADD 2 Start with 1: €11k to €261k a year before your own investment, which the site model prices. Add 2 when a firm operator takes 20 MW and 2 ha of land: plus €720k to €2.11M a year, indicative as of 6 Nov 2026.
WHAT SITS ON THE SITE
20 MW of flexible compute in containers on about 2 ha, and a firm block of 20 MW on about 2 ha more, or in a hall the site no longer uses. A temperature lift plant using about 570 kW to 970 kW of electricity at full load, sized to the heat taken and tied into the network return. The rest of the heat goes to dry coolers. Everything sits behind your meter on the stations' own switchgear. The stations' dispatch stays with you: the flexible block follows the spare hours, the firm block runs on its reserved share. The switchyard, the plant's data links and an operations team on site around the clock are what a firm operator looks for first.
HOW WE COUNT · DRAFT
Flexible compute: per MW of connection it draws about 0.93 MW and returns about 0.8 MW of heat to a water loop at 55 to 65 °C. A temperature lift stage raises it into the network's band and uses electricity, about a sixth to a quarter of the heat it delivers (from a 65 or a 55 °C source). Flexible compute runs in the spare hours only and pays €30 (low) to €45 (high) per MWh all-in; your gain is the part above what the power earns today. Firm compute: liquid-cooled rack-scale systems at a PUE of 1.2 and a load factor of 0.70 of the connection (0.60 to 0.80) over 8,760 hours: 5,300 to 7,000 MWh through the connection and 4,000 to 5,300 MWh of heat to the loop at about 50 °C, per MW a year. The connection carries €3 to €7 per kW of reserved capacity a month, take-or-pay and indexed yearly, €36k to €84k per MW a year, indicative as of 6 Nov 2026; sites that can take load before 2028 command the top of the range. Power at your tariff plus a margin, worked out in the site model and agreed only in signed agreements. One hectare takes about 10 MW of containers. Heat from either kind counts at the share you set, bought at 20 to 40% below your fuel cost. The low case also pays the lift stage's electricity, counted at a quarter of the heat delivered (the 55 °C source): in the spare hours at the price you set, for the firm block at €105/MWh in the EU and €80 elsewhere, a draft tariff figure. The yearly figures are your return before your own investment, which the site model prices. Boiler 90% efficient. Figures rounded. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.
SEND YOUR NUMBERS

Set these to your plant and we turn them into your site model

We come back within 5 working days with what the site model needs: the stations' hourly output and export, the network's return temperature, the connection agreement and a site plan.

Austria 100 MW of generation on site 20 MW spare for flexible compute 4,000 spare hours a year Spare power earns €40 to €80/MWh today Firm block 20 MW 1 to 5 ha · 5 to 10 years Heat taken: 10% of the compute heat, 60 to 95 °C €70/MWh €11k to €261k a year, flexible €720k to €2.11M a year, firm, indicative
We use your name, email, company and the figures you send to reply to you, as set out in our Privacy Policy.
WHO IT IS FOR

A plant with its own power stations and a heat network: spare generation in low-load hours, a connection and land that could carry a firm block.

WHAT YOU CAN PROVIDE
  • Generation on site, and the spare power in low-load hours
  • Hours a year that power is spare, and what it earns today
  • Firm power, land and the term you could offer a larger block
  • The share of the compute's heat your network could use, and your gas price
WHAT YOU GET

Your return a year from flexible compute on the spare hours, an indicative return for a firm AI or HPC block on the connection and land, and what sits on the site.