Stations built for more than the site uses today. The spare part is worth something.
For an industrial site with gas-fired power stations of its own and a heat network inside the fence and beyond it. When the site uses less than the stations were built for, part of the generation, the connection and the land is spare. Two kinds of compute fit a site like this. The starting values are typical of such a site; set them to yours.
- RUNS
- In the hours your stations have spare power; steps off when the site needs it.
- STARTS
- Typically in containers on the connection you have, without a new building or a new grid connection; the site model checks permits and the connection.
- GROWS
- Step by step, as the spare hours allow.
- ASKS
- Space, a first term and an investment on your side: [site works, the connection point and the heat tie-in]INDICATIVE · 6 NOV 2026, priced in the site model.
- RETURN
- Every year: the spare power, where compute's draft range is above what you get today, and the heat you take.
- RUNS
- All year on a reserved share of your stations and your connection; interruptions typically under 1% of hours, at most 5%, agreed in the contract.
- STARTS
- Once the site model and the agreements are in place. Fibre nearby, which we check.
- GROWS
- In blocks of 5 MW and more, on land the site no longer needs or in a hall.
- ASKS
- Firm power, land or a hall, and an investment on your side: [connection works and land or hall preparation]INDICATIVE · 6 NOV 2026, priced in the site model. 10 years, the operator's commitment to you.
- RETURN
- Every year: a fee per kW of reserved capacity a month, its power at your tariff plus a margin, and its heat at about 50 °C.
| PER YEAR | LOW | HIGH |
|---|---|---|
| Gain on spare power, 74,700 MWh | €0 | €0 |
| Net heat saving, 8,390 MWh | €11k | €261k |
| Your return a year | €11k | €261k |
HOW WE COUNT · DRAFT
Set these to your plant and we turn them into your site model
We come back within 5 working days with what the site model needs: the stations' hourly output and export, the network's return temperature, the connection agreement and a site plan.
A plant with its own power stations and a heat network: spare generation in low-load hours, a connection and land that could carry a firm block.
- Generation on site, and the spare power in low-load hours
- Hours a year that power is spare, and what it earns today
- Firm power, land and the term you could offer a larger block
- The share of the compute's heat your network could use, and your gas price
Your return a year from flexible compute on the spare hours, an indicative return for a firm AI or HPC block on the connection and land, and what sits on the site.