OPERATORS

Which sites fit your compute?

Set what you need in power, heat and term. See which site types fit, and what a host of each type sees on its own calculator. Then ask for anonymised site cards.

5 of 5 site types fit heat users, spare-power sites, flare and mine gas, post-coal sites
Ceiling €45/MWh 1 MW to 5 MW Up to 30%
STEP 1 Regions of interest Pick any that apply.
STEP 2 What you run
Flexible tier: tolerates curtailment and pays an all-in price for cheap power. Changes the fit logic and the reply, nothing else.
STEP 3 Load wanted per site, minimum
Load wanted per site, ideal
Post-coal sites and large hosts start at 5 MW; smaller sites fit the minimum.
STEP 4 Run profile
Spare-power and gas sites fit; heat users want more hours unless the host has its own power.
STEP 5
€45/MWh including hosting
€20/MWh €150/MWh
At €45/MWh your ceiling sits inside the surplus band of €30 to €45/MWh all-in and below the grid-bought stack of about €105/MWh in the EU, so surplus, curtailed and gas-to-power hosts fit and grid-fed heat hosts do not. Default €45/MWh.
STEP 6 Can you deliver loop heat at 55 to 65 °C?
Would you include a temperature lift stage where the host needs it?
STEP 7 Power source you accept
STEP 8 Cooling
Liquid cooling is what returns heat to a water loop.
STEP 9 Term you plan on
STEP 10 What you do Pick any that apply.
STEP 11 Commercial model you prefer Pick any that apply.
5 of 5 site types fit heat users, spare-power sites, flare and mine gas, post-coal sites
Ceiling €45/MWh 1 MW to 5 MW Up to 30%
RESULT · FIT BY SITE TYPE
A · Quick check (any site) FIT
The quick check sends hosts to the pages above; your profile reaches it through heat users, spare-power sites, flare and mine gas, post-coal sites.
B · Heat users FIT
You deliver loop heat and accept a host's own surplus power; 30% curtailment fits a surplus host, less so a grid-fed one.
C · Spare-power sites FIT
You can follow curtailment and your ceiling reaches the surplus band, so spare-power hosts gain from you.
D · Flare gas FIT
You accept gas-to-power, so generator sets at a flare can carry your load off grid.
E · Mine methane FIT
You accept gas-to-power, so gas engines on drained methane can carry your load at the mine.
F · Post-coal sites FIT
Post-coal sites carry 5 MW and more on a connection that stays, and want a term of 5 years or more. Both match.
At €45/MWh your ceiling sits inside the surplus band of €30 to €45/MWh all-in and below the grid-bought stack of about €105/MWh in the EU, so surplus, curtailed and gas-to-power hosts fit and grid-fed heat hosts do not. Default €45/MWh.
WHAT THE HOST SEES One worked site per fitting type, with the figure the host's own calculator shows it, on the same formulas and draft terms.
Heat user: brewery, 6,500 MWh of gas a year, grid power €0 to €68k a year 450 kW of compute returns 50% of its heat. Net saving at 30% below a €70/MWh term gas price; the low case charges the lift electricity at €105/MWh.
Spare-power site: 1 MW, 3,000 spare hours, earning under €40/MWh today €70k to €147k a year €70k from 2,800 MWh of spare power at your ceiling of €45/MWh less the €20/MWh it earns today, plus €0 to €77k from heat.
Flare: 5,000 m³ a day of associated gas, all year €95k to €190k a year 600 kW of compute on generator sets. The host is paid €20 to €40 per MWh of power made, a draft term that does not move with your ceiling.
Mine: 1,000 m³ an hour of drained methane, flared today €547k to €1.09M a year 3.5 MW of compute on gas engines. The same draft term, €20 to €40 per MWh of power made.
Post-coal site: 50 MW connection, 3 ha, 100,000 MWh heat duty €1.12M to €4.11M a year 30 MW of compute, limited by the land. Use of connection and land at €5 to €10 per MWh through it, plus the heat saving; draft terms.
SITES OF THIS SHAPE Counters are off in this sample [decision pending: on or off, and when]. When on, this line reads "Sites of this shape in our pipeline: 3 to 5", in bands, never below 3, never a name and never a country below group level.
How we count

Fit rules are draft. A heat user needs loop heat delivered, 6,500 run hours or more, and a ceiling at or above the grid-bought stack of about €105/MWh in the EU unless the host has its own surplus power. A spare-power site needs curtailment tolerance and a ceiling at or above the surplus band, €30/MWh all-in. Flare and mine sites need gas-to-power acceptance. A post-coal site needs 5 MW or more and a term of 5 years or more. The quick check routes hosts to those pages. Terms in square brackets are indicative, not agreed. Host figures use the same formulas and draft terms as the host calculators: compute at €30 to €45/MWh all-in for spare power, or at your ceiling where shown; heat at 20 to 40% below the host's fuel cost with the lift electricity charged in the low case; gas at a term price of €70/MWh. Draft figures, rounded. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.

ASK FOR SITE CARDS

Anonymised site cards within 5 working days

This page is public. We reply within 5 working days. Anonymised site profiles are shared through the partner door; identities follow only once an NDA and an originator agreement are signed, in that order.

Central Europe Flexible compute (flexible tier) 1 MW to 5 MW per site Up to 30% Ceiling €45/MWh all-in Loop heat yes, lift depends on the site Power: any Liquid cooling · 5 years Operate Hosting fee 5 of 5 site types fit
We use your name, email, company and the figures you send to reply to you, as set out in our Privacy Policy. Already a partner? Request partner access through the partner door.
WHO IT IS FOR

Compute operators, flexible or AI and HPC, looking for sites with power, a connection, land or a use for their heat.

WHAT YOU CAN PROVIDE
  • The regions you would go to
  • The load you want per site, minimum and ideal
  • Your run profile and the curtailment you accept
  • The all-in power price you can pay
WHAT YOU GET

Which site types fit your profile, what a host would see at your price, and anonymised site cards on request. Anonymised site profiles are shared through the partner door; identities follow only once an NDA and an originator agreement are signed, in that order.