SITE BUILDER · DRAFT

Design the site, then see what each piece returns.

Pick where the site is and what kind of site it is, switch pieces on, and the energy balance and the yearly return of each piece update as you go. Existing or planned. The figures are the energy side only, on draft terms; a logistics hall or a farm has its own business, which is yours.

STEP 1

Where is the site?

Tap a country, or pick it from the list. The shade is the solar yield, teal to gold. The table beneath is what the place changes in the figures.

Czechia
WHAT THE PLACE CHANGES
Solar yield 1,050 kWh per kWp a year
Wind 22% capacity factor
Heating need 3,500 degree days
Low-price hours a year 1,800 h
Power price, default €105/MWh
Gas, default €70/MWh
Carbon on heating fuels EU ETS above 20 MW of thermal input, ETS2 from 2028 below it; not counted here
Draft figures by country, and by part of the larger countries. On the live site: a pin at the site itself, solar yield from the EU's PVGIS service, wind from the Global Wind Atlas, degree days from Eurostat, prices by bidding zone.
STEP 2

What kind of site?

A plant on the drawing board: enter what you plan. A planned roof is the easiest solar there is, and the connection you ask for now sets what compute can do later. The starting design has a CHP; switch it off if you will buy all your power.

20 MW
40 MW Import capacity in the connection agreement. Headroom for compute: 30.3 MW at the tightest hour.
60,000 m² About 9 MWp of solar fits this roof. A hall you add brings its own roof.
Land you could give
Solar on land, a container yard, a greenhouse or a firm block all come out of this.
30,000 MWh
€105/MWh What spare power earns you today, in the spare hours
STEP 3

What goes on it?

Switch pieces on and size them. Your own investment figure is optional: with it, the result shows a payback on the energy side; without it, the yearly return, as on the calculators.

On the roof, or on land. The size opens at what the roof carries, about 0.15 MWp per 1,000 m².
9 MWp
Takes about 60,000 m² of roof, or 10.8 ha of land.
Where the site has the land and the permit. More in winter and at night than solar.
Shifts the day's surplus into the night for your own load. It takes the surplus before compute does.
Gas, biogas or an engine on site. Its heat serves your heat needs first; its own economics are yours.
10 MW
Heat 13.0 MW thermal alongside the power.
The quick start. Runs on the spare hours of what is on the site, in containers, and returns its heat.
2 MW
Containers on about 70 m² of yard.
An AI or HPC block on a reserved share of the connection, all year, for a 10-year term. Fee indicative as of 6 Nov 2026.
A tomato or vegetable farm: a large, steady heat sink at low temperature, the best fit for compute heat.
A logistics hall or an office block: a daytime load, a roof for solar, and a heat sink in winter.
Heat you deliver beyond the fence, at 60 to 95 °C, through a lift stage.
A buffer tank: heat made at night serves the day. It lifts the share of compute heat that is used.
Trucks or cars charging at the site, mostly evenings and nights. It takes the battery's power first.
RESULT · ENERGY BALANCE, MWH A YEAR
MWH A YEAR SUMMER WINTER Your own power (solar, wind, CHP) 46,800 42,700 Your load (plant, hall, charging) 53,800 53,800 Compute, flexible and firm 2,500 2,500 Bought from the grid 16,600 19,600 Exported 7,120 5,930 Compute heat used 0 0
Summer is April to September. Compute heat used: 0 of 4,310 MWh it makes a year.
BUILD ORDER Start with the solar and flexible compute, which pays for the spare hours from the first week. Nothing on this page commits either side.
HOW WE COUNT · DRAFT
The year is split into eight kinds of hour: summer and winter, weekday and weekend, day and night. Every piece has a profile across them; the overlap is what counts. Your own power serves your own load first, then the battery, then flexible compute, then export at what spare power earns you today. Compute pays €30 (low) to €45 (high) per MWh of spare power, all-in; your gain is the part above today's price. A firm block pays a fee for the reserved capacity, €3 to €7 per kW a month (€36k to €84k per MW a year), indicative as of 6 Nov 2026, and its power at your tariff plus a margin, worked out in the site model and agreed only in signed agreements; it runs at a load factor of 0.70 of its block over 8,760 hours and returns about 0.75 MWh of heat at about 50 °C per MWh through the connection. Compute returns about 0.86 MWh of heat per MWh it draws, at 55 to 65 °C. CHP heat serves your heat needs first; compute heat serves the rest, low-temperature sinks before lifted ones. Heat is valued at 20 to 40% below your gas cost, €70 per MWh; the low case also pays the lift stage's electricity. Draft figures, rounded. Every profile and term is a draft under review by the model lane. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.
SEND YOUR DESIGN

We turn this design into a model of your site

We come back within 5 working days with what the site model needs for the pieces you chose, and which to start with.

We use your name, email, company and the figures you send to reply to you, as set out in our Privacy Policy.