The connection outlives the coal. So does the heat contract.
A coal site keeps three things worth money after the boilers stop: a large grid connection, land with roads and fences, and often a duty to go on supplying heat. Compute can use the first two and help with the third.
How we count
The compute on a post-coal connection is a firm block: liquid-cooled rack-scale systems at a PUE of 1.2 and a load factor of 0.70 of the connection (0.60 to 0.80) over 8,760 hours, so 5,300 to 7,000 MWh through the connection and 4,000 to 5,300 MWh of heat at about 50 °C, per MW a year. A temperature lift stage raises the heat into the network's band; it uses some electricity, which the site model allocates. One hectare takes about 10 MW of containers with their spacing and transformers. Compute heat counted up to 60% of a seasonal network's annual demand; above 95 °C, 60% of the demand counted as reachable. Replacement gas at a term price of €70/MWh in a 90% efficient boiler. The connection carries a fee of €3 to €7 per kW of reserved capacity a month, take-or-pay and indexed yearly (€36k to €84k per MW a year), indicative as of 6 Nov 2026, a Central European range; its power at your tariff plus a margin, worked out in the site model and agreed only in signed agreements. The heat saving's low case also pays the lift stage's electricity, counted at a quarter of the heat delivered (the 55 °C source; from a 65 °C source it is about a sixth), at €105/MWh in the EU and €80 elsewhere. Draft figures, rounded. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.
Get a reuse sketch of the site within 5 working days
We receive your inputs and the account above as one summary. We come back with how the connection, the land and the heat duty could fit together, and what the site model needs: the connection agreement, the heat contract, and a site plan.
Coal power stations and heating plants that are closing, and mines, whose grid connection, land and heat duty outlive the coal.
- The grid connection that stays, in MW
- Land you could give to compute
- Heat you have to keep supplying a year, and at what temperature
- How long that heat duty runs
What the connection and land could earn from compute, the heat it could return to your network, and whether the connection or the land sets the size.