POST-COAL SITE

The connection outlives the coal. So does the heat contract.

A coal site keeps three things worth money after the boilers stop: a large grid connection, land with roads and fences, and often a duty to go on supplying heat. Compute can use the first two and help with the third.

Figures in EUR. On the live site this is prefilled from your connection.
€1.08M to €4.39M a year to the site, low to high case
30 MW of compute limited by the land 60% of the heat duty returned
STEP 1 Grid connection that stays
The capacity your connection agreement reserves, import and export. It is often the scarcest thing on the site. A connection that stays firm at this scale is what AI and HPC data centres look for first: AI campuses are being brought to where the power is, to secondary markets, on average 175 km from cities (JLL, 2026). The site model compares a one-off sale of the secured capacity with the yearly fee.
STEP 2 Land you could give to compute
About 3 ha counted, taking about 30 MW of containers with their spacing and transformers.
STEP 3
100,000 MWh about €7.78M of gas a year if gas replaces the coal, at a term price of €70/MWh
None 500,000 MWh
Heat delivered to the network or the customers a year, from your licence or your supply contract.
Temperature the network needs
Hot-water networks. A temperature lift stage raises compute heat into this band.
How long the duty runs
A good match for a first compute term, with room to renew.
STEP 4 Solar, wind or an engine on site with power to spare?
Many sites have solar on the roof or an engine. If some of its output is spare in some hours, compute can pay for it.
STEP 5 Battery on site
A battery on site changes how spare hours are used. It carries no figure here; the site model counts it.
€1.08M to €4.39M a year to the site, low to high case
30 MW of compute limited by the land 60% of the heat duty returned
RESULT · YOUR SITE, PER YEAR
Compute the site carries 30 MW of compute · load factor 0.60 to 0.80
What limits it Land: 30 MW on 3 ha
Power through your connection, a year 159,000 to 210,000 MWh
Fee for the reserved capacity, €3 to €7 per kW-month €1.08M to €2.52M
€36k to €84k per MW of connection a year, or €360k to €840k per hectare at 10 MW a hectare: a fee of €3 to €7 per kW of reserved capacity a month, take-or-pay and indexed yearly, indicative as of 6 Nov 2026, a Central European range. Sites that can take load before 2028 command the top of the range.
Heat compute returns to the network 60,000 MWh · up to 60% of the duty
Gas you then do not burn for it 66,700 MWh · €4.67M
Heat saving at 20 to 40% below gas; the low case also pays the lift electricity at €105/MWh €0 to €1.87M
Total to you, low to high €1.08M to €4.39M
Compute could return more heat than the network takes in a season. The rest goes to dry coolers, or to a second customer.
WHY NOW, CZECHIA A 2021 study by ČVUT put coal at about 60% of Czech heat production, and the cost for heating plants of leaving it by 2030 near 100 billion CZK, with gas replacing about two-thirds of the coal heat. Every MWh compute returns can be gas a plant does not have to buy, and carbon pricing applies to that gas: the EU ETS for plants already in it, ETS2 from 2028 for smaller sites.
WHAT SITS ON THE SITE
30 MW of compute in containers on about 3 ha including spacing and transformers, on the connection you already have. A temperature lift plant using about 4.2 MW to 7 MW of electricity, tied into the network return, sized in the site model. The old boiler house, switchyard and control room usually stay useful: a hall for the compute, a point of connection, and an office. Mine gas on the site adds its own power: see the mine methane calculator. Solar or wind on the site is counted above, in the hours it is spare.
How we count

The compute on a post-coal connection is a firm block: liquid-cooled rack-scale systems at a PUE of 1.2 and a load factor of 0.70 of the connection (0.60 to 0.80) over 8,760 hours, so 5,300 to 7,000 MWh through the connection and 4,000 to 5,300 MWh of heat at about 50 °C, per MW a year. A temperature lift stage raises the heat into the network's band; it uses some electricity, which the site model allocates. One hectare takes about 10 MW of containers with their spacing and transformers. Compute heat counted up to 60% of a seasonal network's annual demand; above 95 °C, 60% of the demand counted as reachable. Replacement gas at a term price of €70/MWh in a 90% efficient boiler. The connection carries a fee of €3 to €7 per kW of reserved capacity a month, take-or-pay and indexed yearly (€36k to €84k per MW a year), indicative as of 6 Nov 2026, a Central European range; its power at your tariff plus a margin, worked out in the site model and agreed only in signed agreements. The heat saving's low case also pays the lift stage's electricity, counted at a quarter of the heat delivered (the 55 °C source; from a 65 °C source it is about a sixth), at €105/MWh in the EU and €80 elsewhere. Draft figures, rounded. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.

SEND YOUR SITE

Get a reuse sketch of the site within 5 working days

We receive your inputs and the account above as one summary. We come back with how the connection, the land and the heat duty could fit together, and what the site model needs: the connection agreement, the heat contract, and a site plan.

Czechia 50 MW connection 1 to 5 ha 100,000 MWh heat duty 60 to 95 °C 5 to 10 years 30 MW of compute · €1.08M to €4.39M a year
We use your name, email, company and the figures you send to reply to you, as set out in our Privacy Policy.
WHO IT IS FOR

Coal power stations and heating plants that are closing, and mines, whose grid connection, land and heat duty outlive the coal.

WHAT YOU CAN PROVIDE
  • The grid connection that stays, in MW
  • Land you could give to compute
  • Heat you have to keep supplying a year, and at what temperature
  • How long that heat duty runs
WHAT YOU GET

What the connection and land could earn from compute, the heat it could return to your network, and whether the connection or the land sets the size.