You already make the power and move the heat. Compute fits between the two.
For an industrial plant with a combined heat and power station on site: it makes its own power, and a heat network takes the station's heat. Two kinds of compute fit a plant like this. The starting values are typical of such a plant; set them to yours.
Flexible compute
THE QUICK START
- RUNS
- In your surplus hours; steps off when the plant needs the power.
- STARTS
- Typically in containers on the connection you have, without a new building or a new grid connection; the site model checks permits and the connection.
- GROWS
- Step by step, as the surplus allows.
- ASKS
- Space, a first term and an investment on your side: [site works, the connection point and the heat tie-in]INDICATIVE · 6 NOV 2026, priced in the site model.
- RETURN
- Every year: the surplus power, where compute's draft range is above what you get today, and the heat you take.
Firm compute, for AI or HPC
THE LARGER COMMITMENT
- RUNS
- All year on a reserved share of your connection; interruptions typically under 1% of hours, at most 5%, agreed in the contract.
- STARTS
- Once the site model and the agreements are in place. Fibre nearby, which we check.
- GROWS
- In blocks of 5 MW and more, in a hall or on land.
- ASKS
- Firm power, land or a hall, and an investment on your side: [connection works and land or hall preparation]INDICATIVE · 6 NOV 2026, priced in the site model. 10 years, the operator's commitment to you.
- RETURN
- Every year: a fee per kW of reserved capacity a month, its power at your tariff plus a margin, and its heat at about 50 °C.
2 MW of flexible compute
9,330 MWh of surplus used
800 MWh of heat taken
STEP 1
Surplus power the station could give it
2 MW of flexible compute, in containers or indoors, drawing about 1.9 MW when running. A surplus block is often 1 to 5 MW; the station's export profile sets it.
STEP 2
5,000 h
Weekends and some nights
500 h
8,500 h
Weekends alone are about 2,500 hours a year. Nights on a two-shift pattern, holiday shutdowns and the winter hours when the station runs for the heat network add to it.
STEP 3
The price you sell or offload this power at today
Compute pays €30 to €45/MWh all-in, a draft range; your gain is the part above the price you get today.
STEP 4
Also on the site
Pick any that apply.
Solar or wind with spare output counts with the surplus above; the site model separates its hours. A battery carries no figure here; the site model counts how it and compute share the hours.
2FIRM COMPUTE, ON YOUR CONNECTION
STEP 5
Power that stays firm all year for an AI or HPC block
From the station and the grid connection together. These operators care about firmness, a data link and speed to power more than the price: AI campuses are being brought to where the power is, to secondary markets, on average 175 km from cities (JLL, 2026). Blocks from 5 MW; interruptions typically under 1% of hours, at most 5%, agreed in the contract; 10 years, the operator's commitment to you.
HEAT · FROM EITHER KIND
STEP 6
10%
about 800 MWh a year from flexible, 4,000 to 5,300 MWh from firm
0%
100%
Hot-water process heat, space heating and hot water can use it; steam cannot. Set it to what the network actually needs. At 0% all of it goes to dry coolers.
Temperature the network return takes the heat at
Through a heat exchanger into the network return. No temperature lift.
€70/MWh
Reference: TTF front month €86/MWh on 15 Oct 2026, as reported by oEnergetice.cz; contracts for 2027 at €72 and for 2028 at €46. Counted at a term price of €70/MWh delivered, a draft figure; set your own above. For a CHP station this is the gas it burns for the heat; if the station is in the EU emissions trading system, add the allowance cost per MWh of gas.
2 MW of flexible compute
9,330 MWh of surplus used
800 MWh of heat taken
Gain on surplus power
Net heat saving
Low case
€12k
High case
€165k
| PER YEAR | LOW | HIGH |
|---|---|---|
| Gain on surplus power, 9,330 MWh | €0 | €140k |
| Net heat saving, 800 MWh | €12k | €25k |
| Your return a year | €12k | €165k |
Firm block, all year, load factor 0.60 to 0.80
10 MW
Power through your connection, a year
53,000 to 70,000 MWh
Fee for the reserved capacity, €3 to €7 per kW-month
€360k to €840k
Its heat at about 50 °C, 4,000 to 5,300 MWh, net
€62k to €165k
Its power
your tariff plus a margin
HOW WE COUNT · DRAFT
Flexible compute: per MW of connection it draws about 0.93 MW and returns about 0.8 MW of heat to a water loop at 55 to 65 °C. Up to 60 °C it goes through an exchanger into the network return; above that a temperature lift stage raises it and uses electricity, about a sixth to a quarter of the heat it delivers (from a 65 or a 55 °C source).
Flexible compute runs in your surplus hours only and pays €30 (low) to €45 (high) per MWh all-in; your gain is the part above what the export earns today.
Firm compute: liquid-cooled rack-scale systems at a PUE of 1.2 and a load factor of 0.70 of the connection (0.60 to 0.80) over 8,760 hours: 5,300 to 7,000 MWh through the connection and 4,000 to 5,300 MWh of heat to the loop at about 50 °C, per MW a year. The connection carries €3 to €7 per kW of reserved capacity a month, take-or-pay and indexed yearly, €36k to €84k per MW a year, indicative as of 6 Nov 2026; sites that can take load before 2028 command the top of the range. Power at your tariff plus a margin, worked out in the site model and agreed only in signed agreements.
Heat from either kind counts at the share you set, bought at 20 to 40% below your fuel cost. The low case also pays the lift stage's electricity, counted at a quarter of the heat delivered (the 55 °C source): in the surplus hours at the price you set, for the firm block at €105/MWh in the EU and €80 elsewhere, a draft tariff figure.
The yearly figures are your return before your own investment, which the site model prices. Boiler 90% efficient. Figures rounded. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.
Set these to your plant and we turn them into your site model
We come back within 5 working days with what the site model needs: the station's export profile, the network's return temperature and the connection agreement.
Austria
Own CHP station
2 MW of surplus for flexible compute
5,000 surplus hours a year
Export earns €20 to €40/MWh today
Firm block 10 MW
Heat taken: 10% of the compute heat, up to 60 °C
€70/MWh
€12k to €165k a year, flexible
€422k to €1.00M a year, firm, indicative
WHO IT IS FOR
A plant with its own combined heat and power station: surplus power in the hours the plant does not need it, and a heat network that could take heat back.
WHAT YOU CAN PROVIDE
- Surplus power the station could give, and the hours a year it has it
- What that power earns you today, or costs you to offload
- Power that could stay firm all year for a larger block
- The share of the compute's heat your network could use, and your gas price
WHAT YOU GET
Your return a year from flexible compute on the surplus, an indicative return for a firm AI or HPC block on the connection, and what sits on the site.