Could your site host modular compute?
Six questions, two minutes. Your signal and first numbers update as you tap. No email needed to see them.
How we count
Per MW of connection, compute draws about 0.93 MW and returns about 0.8 MW of heat to a water loop at 55 to 65 °C. Above 60 °C a temperature lift stage raises it into your band; it uses electricity, about a sixth to a quarter of the heat it delivers (from a 65 or a 55 °C source). 8,000 run hours a year. Gas at a term price of €70/MWh in Europe and €50 elsewhere, in a 90% efficient boiler. Saving shown at a 30% heat discount, a draft term; above 60 °C the low case also pays the lift stage's electricity, counted at a quarter of the heat delivered (the 55 °C source), at €105/MWh in the EU and €80 elsewhere. Score weights: power 28, source 16, what the power earns today 20, heat 22, space 8, term 8. Draft figures, rounded. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.
Get a first view of your site within 5 working days
Your answers and the numbers above reach us as one summary. We come back with what a site visit would check, for the compute and for the heat stage. If a colleague decides, send them the same summary.
Anyone with a site and no figures ready yet: a plant, a park, a farm, a mine, a site that is closing. Six questions, no numbers, a couple of minutes.
- A rough idea of the power on your site
- Whether you use heat, and roughly how much
- What your spare power earns today, if any
- Your country
A signal for your site, what lifts it and what holds it back, a first view of the compute and the heat it could carry, and the calculator to open next with your answers carried over.