SITE SIGNAL

Could your site host modular compute?

Six questions, two minutes. Your signal and first numbers update as you tap. No email needed to see them.

Figures in EUR. On the live site this is prefilled from your connection.
Strong signal Saving €0 to €294k a year on heat
1 OF 6 Electrical power you could give to compute
2 OF 6 Where that power comes from Pick any that apply.
3 OF 6 What does that power earn you today? In the hours you could give to compute.
4 OF 6 Do you burn gas or oil for heat?
Temperature your heat is used at
Process water, cleaning, pasteurising, radiators, district heating.
5 OF 6 Space for the compute
6 OF 6 Could you host for three years or more?
Strong signal Saving €0 to €294k a year on heat
RESULT · YOUR SIGNAL 86 / 100
Strong signal Your site has what compute operators look for.
WHAT LIFTS IT
Heat at 60 to 95 °C is reached with a temperature lift stage on the compute loop.
Under €40/MWh: compute's draft range of €30 to €45/MWh all-in can sit above what you get today.
1 to 2 MW: we count 1.5 MW of compute, in containers or indoors.
Compute capacity 1.5 MW containers or indoors, about 50 m² if indoors
Heat available 12,600 MWh a year, lifted into your 60 to 95 °C band
Gas it replaces €979k a year, if your site uses it all
Your saving €0 to €294k a year at a 30% heat discount; the low case also pays the lift stage's electricity at €105/MWh. Draft terms
How we count

Per MW of connection, compute draws about 0.93 MW and returns about 0.8 MW of heat to a water loop at 55 to 65 °C. Above 60 °C a temperature lift stage raises it into your band; it uses electricity, about a sixth to a quarter of the heat it delivers (from a 65 or a 55 °C source). 8,000 run hours a year. Gas at a term price of €70/MWh in Europe and €50 elsewhere, in a 90% efficient boiler. Saving shown at a 30% heat discount, a draft term; above 60 °C the low case also pays the lift stage's electricity, counted at a quarter of the heat delivered (the 55 °C source), at €105/MWh in the EU and €80 elsewhere. Score weights: power 28, source 16, what the power earns today 20, heat 22, space 8, term 8. Draft figures, rounded. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.

SEND YOUR SIGNAL

Get a first view of your site within 5 working days

Your answers and the numbers above reach us as one summary. We come back with what a site visit would check, for the compute and for the heat stage. If a colleague decides, send them the same summary.

Czechia 1 to 2 MW Solar or wind Power earns under €40/MWh Heat at 60 to 95 °C Plant room or hall 3 years or more Signal 5 of 5
We use your name, email, company and the figures you send to reply to you, as set out in our Privacy Policy.
WHO IT IS FOR

Anyone with a site and no figures ready yet: a plant, a park, a farm, a mine, a site that is closing. Six questions, no numbers, a couple of minutes.

WHAT YOU CAN PROVIDE
  • A rough idea of the power on your site
  • Whether you use heat, and roughly how much
  • What your spare power earns today, if any
  • Your country
WHAT YOU GET

A signal for your site, what lifts it and what holds it back, a first view of the compute and the heat it could carry, and the calculator to open next with your answers carried over.