Put a number on your spare power.
For sites that curtail, spill or sell power cheaply for part of the year. Set the scale and the hours, and see what flexible compute and its heat could be worth to you each year.
1 MW of compute · 33 m² if indoors
2,800 MWh of spare power used
2,470 MWh of heat returned
STEP 1
Where the spare power comes from
Optional. Picking one sets a typical number of spare hours below.
STEP 2
Power you can give to compute
We count 1 MW of compute, in containers or indoors. Draws about 930 kW when running.
STEP 3
3,000 h
Price-led: runs when power is cheap
500 h
8,500 h
Count the hours you curtail, spill, or sell for less than about €40/MWh. A solar park in Central Europe often has 1,000 to 2,000 such hours a year, mostly summer middays, and the number is rising. A biogas or landfill gas engine after its support runs out has them whenever the market pays less than that, and a landfill's connection is usually larger than today's output. An engine or hydro plant can offer most of the year.
STEP 4
What that power earns you today, in those hours
Compute pays €30 to €45/MWh all-in on the draft range; your gain is the part above what you get today.
STEP 5
Temperature your heat is used at
Through a temperature lift stage sized to the compute heat.
8,000 MWh
500 MWh
500,000 MWh
€70/MWh
Reference: TTF front month €86/MWh on 15 Oct 2026, as reported by oEnergetice.cz; contracts for 2027 at €72 and for 2028 at €46. The saving is counted at a term price of €70/MWh delivered, a draft figure; set your own above. If you make heat another way, enter the fuel cost you would stop paying.
€105/MWh
The temperature lift stage uses electricity, about a sixth to a quarter of the heat it delivers, from a 65 or a 55 °C source. The low case charges it at this price; the high case does not. Default €105/MWh, a draft figure.
STEP 6
Battery on site
A battery on site changes how spare hours are used. It carries no figure here; the site model counts it.
1 MW of compute · 33 m² if indoors
2,800 MWh of spare power used
2,470 MWh of heat returned
Gain on spare power
Net heat saving
Low case
€28k
High case
€147k
| PER YEAR | LOW | HIGH |
|---|---|---|
| Gain on spare power, 2,800 MWh | €28k | €70k |
| Net heat saving, 2,470 MWh | €0 | €77k |
| Total to your site | €28k | €147k |
The heat replaces 2,740 MWh of gas a year, €192k at your price. Priced at 20 to 40% below the fuel in this sample, a draft term; the low case also pays the lift stage's electricity at €105/MWh.
680 MWh of heat a year is made when you cannot use it. A buffer tank or a neighbour could take some of it.
HOW WE COUNT · DRAFT
Per MW of connection, compute draws about 0.93 MW and returns about 0.8 MW of heat to a water loop at 55 to 65 °C.
Above 60 °C a temperature lift stage raises it into your band. It uses some electricity, which the site model allocates.
Compute runs only in your spare hours. Heat counts only in those hours, and only up to what you use.
Compute pays €30 per MWh of spare power in the low case, €45 in the high case, all-in. Your gain is the difference to what the power earns you today. Draft terms.
Heat bought at 20% below your fuel cost in the low case, 40% in the high case. The low case also pays the lift stage's electricity, counted at a quarter of the heat delivered (the 55 °C source), at your electricity price; the high case does not. Draft terms.
Where the power comes from sets a typical number of spare hours; the hours you set are what counts. A battery is counted in the site model, not here.
If a firm operator takes a site of 5 MW and more: a fee of €3 to €7 per kW of reserved capacity a month (€36k to €84k per MW a year), indicative as of 6 Nov 2026; energy at a load factor of 0.70 of the connection (0.60 to 0.80) over 8,760 hours; heat at about 90% of the IT load at a PUE of 1.2, at about 50 °C. Counted outside the total.
Boiler 90% efficient. Gas at the price you set. Figures rounded. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.
Turn this into a model of your site
We come back within 5 working days with what a site model would need and, where the numbers hold, private access to one. Share it with whoever signs off.
Czechia
1 MW for compute
3,000 spare hours a year
Power earns under €40/MWh today
Heat at 60 to 95 °C
8,000 MWh of gas for heat
€70/MWh
€28k to €147k a year
WHO IT IS FOR
Solar and wind parks, hydro, and plants with grid capacity they do not use. Biogas and landfill gas engines have a page of their own on the same calculator.
WHAT YOU CAN PROVIDE
- The capacity you could give to compute, in kW or MW
- Hours a year that power is spare
- What that power earns you today in those hours
- Your heat use, if you want the heat counted
WHAT YOU GET
What your spare hours could return where compute's draft range is above what you earn today, and the heat it returns, as a low and a high case a year.