Anatomy of a Site: An Industrial Plant With Its Own Power Station

14 July 20268 min readEnergySignal team

Cover: Anatomy of a Site, an industrial plant with its own power station. A stylised week of station output against plant load, with the exported surplus between them marked in green.

A manufacturing plant with its own combined heat and power station is one of the best-placed hosts in Europe, and usually does not know it. Below we take one such plant apart and show where its value sits.

The plant in this article is a composite. We have drawn it from a shape we see often in Central Europe, a manufacturing plant that generates its own power with gas-fired CHP, runs its lines on weekdays, slows at weekends, heats its halls and processes from the same station, and sells whatever power it cannot use into the grid at whatever the market pays. No company, town or plant is named. The figures are the starting values of our plant calculator, and any host can set them to its own plant at energysignal.io/calculator/own-chp.

What makes the shape interesting is that it has all four of the things that set a site's value: a connection that is only partly used, hours in which the power earns little, a heat network at the right temperature, and the land, data links and term that a larger project would need. Most hosts watch the energy bill closely and the surplus hardly at all, and the surplus is the part we would look at first.

The week: where the surplus comes from

The station is sized for the plant at full production. On a weekday it runs close to the plant's load, with a little export at night. At the weekend the lines stop, the station keeps running to carry the heat and the base load, and the difference between what it makes and what the plant uses goes to the grid. Over a year those hours add up. In the calculator's starting case there are 6,000 hours a year in which about 1 MW is spare.

The surplus is sold, but it is sold badly. Weekend and overnight hours are when the market pays least, and in a growing number of them it pays nothing, or less than nothing. In the starting case the plant's export earns between €20 and €40 per MWh in those hours. That is the number a compute partner competes with, and it is a low bar.

Figure 1: The surplus appears at weekends and overnight, when power is worth least. A stylised week at a plant with its own CHP station: output runs flat above a plant load that peaks on weekday shifts and falls at the weekend, and the exported surplus between them is largest at the weekend.

The flexible layer: 1 MW on the surplus hours

The first thing a compute partner would put on this site is a flexible layer of modular compute, in containers next to the station, sized to the surplus. In the starting case that is 1 MW of compute running in the 6,000 surplus hours. It draws about 0.93 MW per MW of connection, so it uses about 5,600 MWh a year that the plant would otherwise have exported at €20 to €40 per MWh. The compute pays for that power. The plant's gain is the difference between what the compute pays and what the export earns today, and it is counted in those hours only.

The second line is heat. Per MW, the compute returns about 0.8 MW of heat to a water loop at about 55 °C, which over 6,000 hours comes to about 4,800 MWh of heat a year. The plant's own network runs below 60 °C, so the heat can go through a heat exchanger straight into it, with no temperature lift stage. How much of it the plant can take depends on its heat demand in the surplus hours, and that demand is lowest at weekends, exactly when the surplus is highest. The calculator starts with a cautious share and lets the host set it. The site model reads it from the network's data. Every MWh of heat the plant takes displaces fuel the station would otherwise burn for heat, and the carbon cost that comes with that fuel.

The third line is flexibility. The layer steps back within minutes when the plant needs the power, so production always comes first. That is also what lets it live inside the plant's existing connection. It does not add to the plant's peak, so it typically needs no new connection of its own.

The firm block: a reserved share of the connection

The same plant has a second case, and it is the larger one. A plant of this kind sits on a firm, high-voltage connection, often with more capacity than two shifts of production use. A firm block of AI or HPC compute can take a reserved share of that connection and run all year. In the calculator's starting case the firm block is 10 MW, and at 8,000 hours a year that puts about 74,000 MWh through the connection.

The firm block pays for different things. Flexible compute pays for cheap power in the hours when it is cheap. Firm compute pays for the connection and the land it occupies, as a fee tied to the energy that flows through the connection point, and it pays for its power at the plant's tariff plus a margin agreed in the site model. It returns heat too, all year rather than only at weekends, so its heat line can be larger than the flexible layer's even at the same share.

It also asks for more. It needs firm power, a data link, a long term (the calculator proposes ten years, as a draft term), and a large investment per MW in the compute itself. So the order matters. The flexible layer starts on the connection the plant already has, proves the site's hours, heat loop and operating record, and makes the firm block an easier decision for everyone who has to sign it.

What the plant puts in, and what it gets back

For the flexible layer, the plant provides space for containers near the station, a first term, and a minimal investment of its own, which the site model prices once the layout is known. Who supplies what else, and on which terms, is agreed in the site model. In return the plant receives, every year, its surplus power paid above what it earns today, plus the heat it takes. The calculator shows this as a return before the plant's own investment.

For the firm block, the plant provides firm power, land or a hall, a long term and more on its side, which the site model sets out. In return it receives a fee for connection and land, its power paid at the plant's tariff plus a margin, and the block's heat.

Nothing in the calculator commits either side. It says what the plant's numbers suggest, and the site model turns them into terms.

What the site model would check first

Six things decide whether the starting case is actually this plant's case.

  1. A year of metered export, hour by hour. The 6,000 hours and the 1 MW are placeholders until the meter says otherwise. The model reads the real surplus and how it falls across the week and the year.
  2. The export contract. What the surplus earns today, in which hours, and when the contract or its price changes. The gain on the power side is measured against this.
  3. The station's dispatch and heat duty. Whether the station must run at the weekend for heat or can turn down, and what fuel it burns for heat in the surplus hours.
  4. The network's return temperature and summer demand. The heat line depends on the share the network can take, by month.
  5. The connection agreement. Reserved capacity, import and export, whether it is firm, and how much of it two shifts of production use. This is what sizes the firm block.
  6. Land, fibre and permits. Where the containers would stand, where a hall could go, which fibre routes reach the site, and what the existing permits allow.

Most of these sit in the plant's files already. Sending them over is what turns a calculator result into a site model.

Start light, then add the firm block

The pattern we come back to is a firm core of AI or cloud capacity on firm supply, with a flexible layer beside it that uses surplus or curtailed energy and can step back within minutes when the core or the grid needs power. The flexible layer does not have to wait for the core. It can start first and earn from the site while firm supply and grid upgrades are built.

Figure 2: Flexible and firm compute sharing one site. Firm supply feeds a GPU core that runs every hour. Surplus energy feeds a flexible layer of modular compute that can step back when the core or the grid needs power.

This plant shows why that order makes sense. The flexible layer fits inside the connection and the surplus the plant has today, and it can start on a first term while the firm case is prepared. The firm block is the larger prize, but it is signed more easily once the flexible layer has shown that the hours, the heat loop and the operating arrangements work.

If you run a plant like this one, we would like to help you see what it is worth. The plant calculator at energysignal.io/calculator/own-chp is the place to start, and the rest of our calculators are at energysignal.io/calculators. Or write to us at info@energysignal.io and we can go through your site with you and talk through what it could be worth.

Also in this series

Sources

  • The plant shape, the starting values (1 MW of surplus for 6,000 hours a year, an export price of €20 to €40 per MWh, a 10 MW firm block) and the physics (per MW of connection, compute draws about 0.93 MW and returns about 0.8 MW of heat at about 55 °C) are those of EnergySignal's plant calculator and site model. Commercial terms on the calculator are draft terms and are labelled as such: energysignal.io/calculator/own-chp

Information only, as of the date shown. Not an offer, and not legal, tax, regulatory or investment advice. Any arrangement is agreed only in signed agreements.