This is the spare power calculator on a preset. Biogas starts at 8,000 engine hours a year. Landfill gas starts at the same hours and notes that gas output declines year by year, so compute is sized to the decline in the site model, and that the grid connection is usually larger than today's output. The preset sets the starting values; change anything below and the figures follow your inputs.
Put a number on your spare power.
For sites that curtail, spill or sell power cheaply for part of the year. Set the scale and the hours, and see what flexible compute and its heat could be worth to you each year.
| PER YEAR | LOW | HIGH |
|---|---|---|
| Gain on spare power, 7,470 MWh | €75k | €187k |
| Net heat saving, 6,580 MWh | €0 | €205k |
| Total to your site | €75k | €391k |
HOW WE COUNT · DRAFT
Turn this into a model of your site
We come back within 5 working days with what a site model would need and, where the numbers hold, private access to one. Share it with whoever signs off.
Biogas plants and landfill gas sites whose engines earn less than they did: the feed-in tariff or green bonus has run out or is running out, and the power now sells at the market price, often under €40/MWh in the hours that matter, while the engines still run all year on gas the site makes anyway. Compute on site can be a buyer for those hours, at a draft range of €30 to €45/MWh all-in, and its heat can serve the digester or a neighbour.
- Engine capacity, in kW or MW
- Hours a year the engines run, or could run, for compute
- What the power earns today in those hours, after support
- Whether the digester or a neighbour could use heat
What those engine hours could return where compute's draft range is above what the power earns today, plus any heat, as a low and a high case a year.