HYDRO POWER

Put your water to work in the cheap hours.

For run-of-river, reservoir and pumped storage plants. Set the plant and the hours its power earns little, and see what flexible compute could be worth to you each year, and what a firm block on your connection could add.

Figures in EUR. On the live site this is prefilled from your connection.
€14k to €21k a year to your plant from flexible compute, low to high case
1 MW of compute 470 MWh in cheap hours, 13% of output
STEP 1 What kind of plant
Runs with the river, so it makes power whatever the price. Its cheap hours are the ones the grid pays least for: mostly around midday in spring and summer, when solar floods the market.
STEP 2 Installed capacity
We count 1 MW of compute, in containers beside the plant. Draws about 930 kW when running.
STEP 3
3,500 h about 3,500 MWh a year
1,000 h 7,000 h
Your yearly output divided by installed capacity. The Czech regulator counts 4,000 hours a year for a new small plant; plants under 10 MW in Czechia ran about 3,500 hours in 2024 and about 2,700 in the dry 2025, our calculation from its yearly reports.
STEP 4
500 h The cheapest hours only
100 h 6,000 h
Hours a year your power sells for little or nothing. For scale: Czechia had 322 hours of negative prices in 2025 and Germany 573, mostly around midday in spring and summer; counting zero and near-zero prices, Czechia had 531 such hours in 2024. At so few hours a year, flexible compute usually needs power at close to nothing to pay for itself. The site model checks whether a smaller block that runs more of the year, or a heat user, carries the case.
STEP 5 What that power earns you today, in those hours
Compute pays €30 to €45/MWh all-in on the draft range; your gain is the part above what you get today.
STEP 6 Support on your output
Your power sells at the market price, so every cheap hour counts here.
STEP 7
€14k to €21k a year to your plant from flexible compute, low to high case
1 MW of compute 470 MWh in cheap hours, 13% of output
RESULT · FLEXIBLE COMPUTE, PER YEAR
Gain on the cheap hours Net heat saving
Low case €14k
High case €21k
PER YEAR LOW HIGH
Gain on the cheap hours, 470 MWh €14k €21k
Net heat saving, no heat user €0 €0
Total to your plant €14k €21k
Compute takes 470 MWh a year in your cheap hours, 13% of what your plant makes. The rest of your output sells as it does today.
WHAT SITS AT YOUR PLANT
1 MW of compute in containers beside the plant, or indoors on about 33 m². Each square is one sizing step of closed, liquid-cooled compute on about 5 m² of floor if indoors. Containers beside the plant are the alternative.
HOW WE COUNT · DRAFT
Per MW of connection, compute draws about 0.93 MW and returns about 0.8 MW of heat to a water loop at 55 to 65 °C. Compute runs only in the cheap hours you set, sized to your capacity up to 50 MW, and never takes more than your plant makes in a year, which is your capacity times the full-load hours you set. Compute pays €30 per MWh in the low case, €45 in the high case, all-in. Your gain is the difference to what the power earns you today. Draft terms. Heat counts only in the cheap hours and only up to what the heat user takes, bought at 20% below its fuel cost in the low case, 40% in the high case. Above 60 °C a temperature lift stage raises it; the low case also pays its electricity, counted at a quarter of the heat delivered (the 55 °C source). Draft terms. Pumped storage: no flexible case is counted, since the plant buys the cheap hours to pump. If a firm operator takes a block of 5 MW and more: a fee of €3 to €7 per kW of reserved capacity a month (€36k to €84k per MW a year), indicative as of 6 Nov 2026; energy at a load factor of 0.70 of the block (0.60 to 0.80) over 8,760 hours; heat at about 90% of the IT load at a PUE of 1.2, at about 50 °C. Counted outside the total; shown for Central Europe and the Nordics. Hydro figures: the Czech regulator ERÚ, yearly reports on the power system for 2024 and 2025 (full-load hours, our calculation) and decree 79/2022 (4,000 hours for a new small plant); OTE, 15 Jul 2025, and oEnergetice.cz, 24 Jan 2026 (negative and near-zero price hours in Czechia); Bundesnetzagentur, 5 Jan 2026 (Germany); Act 165/2012, section 38(2). Boiler 90% efficient. Gas at the price you set. Figures rounded. Equipment, who supplies it and the terms are worked out in the site model and agreed only in signed agreements.
SEND THESE NUMBERS

Turn this into a model of your plant

We come back within 5 working days with what a site model would need and, where the numbers hold, private access to one. Share it with whoever signs off.

Czechia Run-of-river 1 MW installed 3,500 full-load hours 500 cheap hours a year Power earns nothing in those hours Support: none, market price €14k to €21k a year
We use your name, email, company and the figures you send to reply to you, as set out in our Privacy Policy.
WHO IT IS FOR

Owners and operators of hydro power plants of any size: small run-of-river plants on a weir or a mill race, reservoir and dam plants, and pumped storage. It suits a plant whose power sells for little in high water or at midday, a plant whose support is ending, and a plant of 5 MW and more whose connection could carry a firm block all year.

WHAT YOU CAN PROVIDE
  • Installed capacity and the kind of plant
  • Yearly output, or full-load hours
  • Hours a year the power sells for little or nothing
  • Whether support pays on the output, and until when
  • Any building, greenhouse or network nearby that uses heat
WHAT YOU GET

What your cheap hours could return where compute's draft range is above what the power earns today, plus any heat, as a low and a high case a year; and for a plant of 5 MW and more, an indicative return for a firm block on your connection.