MINE METHANE

Methane you drain is power you can use.

Gas engines turn drained methane into power, and modular compute can use that power at the mine, including in the hours the grid pays least. Set what you capture and see what it could carry.

EU mine: the Methane Regulation's coal rules apply. Figures in EUR. On the live site this is prefilled from your connection.
€571k to €1.14M a year to you, for methane you drain
3.6 MW of compute 4 MW in the gas 8.50 million m³ of methane a year
STEP 1 The mine
Drainage runs ahead of the longwalls. Methane share and flow change with the panel being mined.
STEP 2
1,000 m³/h 17 m³/min · 10 MW of heat in the gas
100 m³/h 10,000 m³/h
Pure methane, not the mixture. Mixture flow times its methane share. Your drainage station log has both.
STEP 3 Methane share in the drained gas
Standard gas engines run on this. 40% electrical efficiency counted at 1 MW and above.
STEP 4 What happens to it today
A flare destroys the methane but wastes the energy. Engines use it.
€571k to €1.14M a year to you, for methane you drain
3.6 MW of compute 4 MW in the gas 8.50 million m³ of methane a year
RESULT · YOUR MINE GAS, PER YEAR
Methane captured 8.50 million m³
Energy in it 85,000 MWh
Power the engines make 28,600 MWh · about 3.4 MW steady
Compute that power carries 3.6 MW of compute
Value to you, low to high €571k to €1.14M
The energy in the gas is used instead of wasted.
EU METHANE REGULATION, COAL Regulation (EU) 2024/1787, Article 22: since 1 January 2025, venting methane from drainage systems, and flaring at a destruction and removal efficiency by design below 99%, are prohibited, with exceptions for emergencies, malfunctions and necessary maintenance. From 1 January 2027, venting through ventilation shafts is prohibited at thermal coal mines emitting more than 5 tonnes of methane per kilotonne of coal mined, and from 1 January 2031 above 3 tonnes; coking coal is treated separately. How these rules apply to your mine is a question for your own advisers.
WHAT SITS AT THE MINE
Gas engines of about 3.7 MW, 3.6 MW of compute Containers on about 192 m² of the surface site, plus the engines. Mines usually have the roads, the fences and the connection already.
Drainage station Your existing drainage station, pumps and gas pipeline. Flow follows the longwall plan.
1,000 m³/h methane · 10 kWh/m³
Gas engines About 3.7 MW installed, counted at 90% load, specified from your gas analysis. Who supplies them is worked out in the site model and agreed only in signed agreements.
3.4 MW to the compute · the mine connection as backup
Compute 3.6 MW of compute, liquid-cooled, in containers. Draws about 3.4 MW.
The mine's grid connection stays as backup and as a second source in the hours the grid pays least. Engine heat and compute heat can warm the surface buildings or a neighbour.
How we count

Methane at 10 kWh per m³ and 0.716 kg per m³. Gas engines at 40% electrical efficiency for your methane share and size; your gas analysis and the engine quote replace it in the site model. Drainage counted at 8,500 hours a year. Compute sized to 85% of the average power to ride through dips in flow; per MW of connection it draws about 0.93 MW. Value at €20 to €40 per MWh of power made, a draft term. Methane burned in the engines rather than vented, counted at 28 times CO₂ over 100 years. Where the gas already runs engines, the value is the uplift on what the power earns today in the hours the grid pays least: compute at €30 to €45/MWh all-in, a draft range, less today's price, floored at zero. Draft figures, rounded. Who supplies the engines and the compute, and on what terms, is worked out in the site model and agreed only in signed agreements.

SEND YOUR MINE GAS NUMBERS

Have the drainage sized for compute within 5 working days

We receive your inputs and the account above as one summary. We come back with what a year of drainage logs and a gas analysis would settle: engine size, compute capacity and who supplies what.

Poland Active mine 1,000 m³/h methane Methane above 30% Flared today 4 MW of power in the gas 3.6 MW of compute · €571k to €1.14M a year
We use your name, email, company and the figures you send to reply to you, as set out in our Privacy Policy.
WHO IT IS FOR

Active and closed coal mines that drain methane, and the operators already running engines on it.

WHAT YOU CAN PROVIDE
  • Methane captured by drainage, in m³ an hour
  • Its methane share in the drained gas
  • What happens to it today: vented, flared or used in engines
  • Where engines run already, what the power earns in the cheapest hours
WHAT YOU GET

The compute the methane could power, its value a year, or the uplift where engines run already, and the methane burned rather than vented.